Expansion of Hong Kong International Airport into a Three-Runway System

Submission of Management Organisations

November 2019

 

 

 

Contents

1       Introduction

2       Management Organisation of the Main Construction Companies

2.1     Advanced Works Contract

2.2     Deep Cement Mixing (DCM) Works Contracts

2.3     Main Reclamation Works Contract

2.4     Airfield Works Contracts

2.5     Third Runway Concourse and Integrated Airport Centres Works Contract

2.6     Terminal 2 Expansion Works Contracts

2.7     Automated People Mover Works Contracts

2.8     Baggage Handling System Works Contract

2.9     Airport Support Infrastructure and Logistic Works Contract

3       Management Organisation of the Environmental Team

4       Management Organisation of the Independent Environmental Checker and His Team

 

Attachment

A.      Organisation Chart of the Works Contracts

B.      Organisation Chart of the ET and IEC

 

 

Tables

Table 1: Contact Information of Key Personnel 3

Table 2: Contact Information of ET  6

Table 3: Contact Information of IEC  7

 

 

 


1        Introduction

The Environmental Impact Assessment (EIA) Report (Register No.: AEIAR-185/2014) prepared for the “Expansion of Hong Kong International Airport into a Three-Runway System” (the Project) has been approved by the Director of Environmental Protection, and an Environmental Permit (EP) (Permit No.: EP-489/2014) has been issued for the project under the Environmental Impact Assessment Ordinance.

The purpose of this updated Management Organisations is to provide the latest information based on the recent contracts awarded under this project. This updated Management Organsations includes the following information:

a)    the management organisation of the main construction companies and/or any form of joint ventures associated with the construction of the Project (in Section 2);

b)    the management organisation of the Environmental Team (ET) (in Section 3);

c)     the management organisation of the Independent Environmental Checker (IEC) and his team (in Section 4); and

d)    organisation charts, names of responsible persons and their contact details.

 

 

2        Management Organisation of the Main Construction Companies

2.1        Advanced Works Contract

Langfang Huayuan Mechanical and Electrical Engineering Co., Ltd. (Contract P560(R)) is the contractor appointed to undertake the diversion of the existing submarine aviation fuel pipelines. Names of the responsible persons and their contact details are set out in Table 1 below.

2.2        Deep Cement Mixing (DCM) Works Contracts

Penta-Ocean-China State-Dong-Ah Joint Venture (Contract 3201), Samsung-Build King Joint Venture (Contract 3202), Sambo E&C Co., Ltd. (Contract 3203), China Road and Bridge-Sambo Joint Venture (Contract 3204) and Bachy Soletanche-Sambo Joint Venture (Contract 3205) are the contractors appointed to undertake the DCM ground improvement works. Construction works of Contracts 3201, 3202, 3203 and 3204 have been completed. Names of the responsible persons and contact details of Contract 3205 are set out in Table 1 below.

2.3        Main Reclamation Works Contract

Zhen Hua Engineering Company Ltd.-China Communications Construction Company Ltd.-CCCC Dredging (Group) Company Ltd. (ZHEC-CCCC-CDC) Joint Venture (Contract 3206) is the contractor appointed to undertake the main reclamation works. Names of the responsible persons and their contact details are set out in Table 1 below.

2.4        Airfield Works Contracts

Fujita Corporation-China Harbour Engineering Company Ltd.-Zhen Hua Engineering Company Ltd. (FJT-CHEC-ZHEC) Joint Venture (Contract 3301) is the contractor appointed to undertake the construction works for the north runway crossover taxiway. China Road and Bridge Corporation (Contract 3302) is the contractor appointed to undertake advance works for the eastern vehicular tunnel.

Sinohydro Corporation Limited, Powerchina Airport Construction Company Limited, Paul Y. Construction Company Limited, and Rock-One Engineering Company Limited (SAPR) Joint Venture (Contract 3303) is the contractor appointed to undertake the construction works for the new runway, taxiways, and associated works. Names of the responsible persons and their contact details are set out in Table 1 below.

2.5        Third Runway Concourse and Integrated Airport Centres Works Contract

Wing Hing Construction Co., Ltd. (Contract 3402) is the contractor appointed to undertake enabling works for the new Integrated Airport Centres. Names of the responsible persons and their contact details are set out in Table 1 below.

2.6        Terminal 2 Expansion Works Contracts

Build King Construction Ltd. (Contract 3501) is the contractor appointed to undertake the construction works for antenna farm and sewage pumping station. Build King Construction Ltd.

(Contract 3502) is the contractor appointed to undertake Terminal 2 (T2) automated people mover (APM) depot modification works.

Leighton–Chun Wo Joint Venture (Contract 3503) is the contractor appointed to undertake T2 foundation and substructure works. Names of the responsible persons and their contact details are set out in Table 1 below.

2.7        Automated People Mover Works Contracts

CRRC Puzhen Bombardier Transportation Systems Ltd. and CRRC Nanjing Puzhen Co., Ltd. (PBTS – CRRC PZ) consortium (Contract 3601) is the contractor appointed to undertake works for the new APM system (TRC Line). Names of the responsible persons and their contact details are set out in Table 1 below.

Niigata Transys Company Ltd. (Contract 3602) is the contractor appointed to undertake the existing APM system modification works. Names of the responsible persons and their contact details are set out in Table 1 below.

2.8        Baggage Handling System Works Contract

Vanderlande Industries Hong Kong Limited and Shun Hing Systems Integration Company Limited (Contract 3603) is the contractor appointed to undertake the construction works of baggage handling system (BHS). Names of the responsible persons and their contact details are set out in Table 1 below.

2.9        Airport Support Infrastructure and Logistic Works Contract

China State Construction Engineering (Hong Kong) Ltd. (Contract 3721) is the contractor appointed to undertake the construction support infrastructure works up to the completion of the 3RS Project. Names of the responsible persons and their contact details are set out in Table 1 below.

China State Construction Engineering (Hong Kong) Ltd. (Contract 3801) is the contractor appointed to undertake the construction works of APM and BHS tunnels on existing airport island. Names of the responsible persons and their contact details are set out in Table 1 below.

Table 1: Contact Information of Key Personnel

Party

Position

Name

Telephone

Email

Contract P560(R)

Aviation Fuel Pipeline Diversion Works

(Langfang Huayuan Mechanical and Electrical Engineering Co., Ltd.)

Project Manager

Wei Shih

2117 0566

wei.shih@hycrossing.com

Environmental Officer

Lyn Liu

5172 6543

xiaolin.liu@hycrossing.com

Contract 3205

DCM (Package 5)

(Bachy Soletanche- Sambo Joint Venture)

Deputy Project Director

Min Park

9683 0765

mpark@bsglsambo.com

Environmental Officer

William Chan

5408 3045

william.chan@bsglsambo.com

Contractor 3206

Main Reclamation Works

(ZHEC-CCCC-CDC Joint Venture)

 

Project Manager

Kim Chuan Lim

3763 1509

kim.lim@3206.zccjv3rs.com

Environmental Officer

Kwai Fung Wong

3763 1452

kf.wong@3206.zccjv3rs.com

Contract 3301

North Runway Crossover Taxiway

(FJT-CHEC-ZHEC Joint Venture)

 

Deputy Project Director

Kin Hang Chung

9800 0048

samuel.chung@chechk.com

Environmental Officer

Nelson Tam

9721 3942

nelsontam@fujitaco.com.hk

Contract 3302

Eastern Vehicular Tunnel Advance Works

(China Road and Bridge Corporation)

Project Manager

Wan Cheung Lee

6100 6075

wc.lee@crbc.com.hk

Environmental Officer

Wilmer Ng

3919 9421

wilmer.ng@crbc.com.hk

Contract 3303

Third Runway and Associated Works

(SAPR Joint Venture)

Project Manager

Steven Meredith

6109 1813

stevenmeredith@pyengineering.com

Environmental Officer

Pan Fong

9436 9435

panfong@pyengineering.com

Contract 3402

New Integrated Airport Centres Enabling Works

(Wing Hing Construction Co., Ltd.)

Contract Manager

Michael Kan

9206 0550

michaelkan@whconst.com.hk

Environmental Officer

Lisa He

5374 3418

lisahe@whconst.com.hk

Contract 3501

Antenna Farm and Sewage Pumping Station

(Build King Construction Ltd.)

Contracts Manager

 

Vincent Kwan

 

9833 1313

 

vincent.kwan@buildking.hk

Environmental Officer

Edward Tam

9287 8270

edward.tam@buildking.hk

Contract 3502

T2 APM Depot Modification Works

(Build King Construction Ltd.)

Project Manager

David Ng

9010 7871

david.ng@buildking.hk

Environmental Officer

Chun Pong Chan

9187 7118

chunpong.chan@buildking.hk

Contract 3503

T2 Foundation and Substructure Works

(Leighton–Chun Wo Joint Venture)

Project Manager

Eric Wu

3973 1718

eric.wu@lcwjv.com

Environmental Officer

Stephen Tsang

5508 6361

stephen.tsang@lcwjv.com

Contract 3601

New APM System (TRC Line)

(PBTS – CRRC PZ Consortium)

Project Director

Weinian Tan

187 9590 8489

weinian.tan@rail.bombardier.com

Environmental Officer

Kim Fai Li

9086 1793

kimfaili@yahoo.com

Contract 3602

Existing APM System Modification Works

(Niigata Transys Co., Ltd.)

Project Manager

Kunihiro Tatecho

9755 0351

kunihiro_tatecho@niigata-transys.com

Environmental Officer

Arthur Wong

9170 3394

arthur.wong@whytecliff.com

Contract 3603

Baggage Handling System

(Vanderlande Industries Hong Kong Ltd. and Shun Hing Systems Integration Co., Ltd.)

 

Project Manager

Andy Ng

9102 2739

andy.ng@shunhinggroup.com

Environmental Officer

Eric Ha

9215 3432

eric.ha@shunhinggroup.com

Contract 3721

Construction Support Infrastructure Works

(China State Construction Engineering (Hong Kong) Ltd.)

Site Agent

Thomas Lui

9011 5340

thomas_lui@cohl.com

Environmental Officer

Gary Hong

6015 0795

yingkeung_hong@cohl.com

Contract 3801

APM and BHS Tunnels on Existing Airport Island

(China State Construction Engineering (Hong Kong) Ltd.)

Project Manager

Tony Wong

9642 8672

tony_wong@cohl.com

Environmental Officer

Fredrick Wong

9842 2703

cheukwai_wong@cohl.com

Attachment A presents the organisation charts of all the above-mentioned contractors required under EP Condition 2.4.

3        Management Organisation of the Environmental Team

The management organisation of the Environmental Team (ET), including names of the ET Leader and Deputy ET Leaders and their contact details are set out in Table 2 below:

Table 2: Contact Information of ET

Name

Position

Telephone

Email

Terence Kong

ET Leader

2828 5919

Terence.Kong@mottmac.com

Heidi Yu

Deputy ET Leader

2828 5704

Heidi.Yu@mottmac.com

Daniel Sum

Deputy ET Leader

2585 8495

Daniel.Sum@mottmac.com

 

Attachment B presents an organisation chart of the ET (together with that for the IEC, as described in Section 4 below) required under EP Condition 2.4.

4        Management Organisation of the Independent Environmental Checker and His Team

The management organisation of the Independent Environmental Checker (IEC), including names of the IEC and Deputy IEC are set out in Table 3 below:

Table 3: Contact Information of IEC

Name

Position

Telephone

Email

Jackel Law

IEC

3922 9376

jackel.law@aecom.com

Roy Man

Deputy IEC

3922 9141

roy.man@aecom.com

 

Attachment B presents an organisation chart of the IEC required under EP Condition 2.4.