Expansion of Hong Kong International Airport into a Three-Runway System

Submission of Management Organizations

October 2020

 

 

 

 

 

 

 

 

 

Contents

1          Introduction 

2          Management Organization of the Main Construction Companies 

2.1       Advanced Works Contract 

2.2       Deep Cement Mixing (DCM) Works Contracts 

2.3       Main Reclamation Works Contract 

2.4       Airfield Works Contracts 

2.5       Third Runway Concourse and Integrated Airport Centres Works Contract 

2.6       Terminal 2 Expansion Works Contracts

2.7       Automated People Mover Works Contracts

2.8       Baggage Handling System Works Contract 

2.9       Construction Support (Facilities) 

2.10     Airport Support Infrastructure 

2.11     Construction Support (Services/ Licenses) 

3          Management Organization of the Environmental Team 

4          Management Organization of the Independent Environmental Checker and His Team 

 

Attachment 

A.        Organization Chart of the Works Contracts 

B.        Organization Chart of the ET and IEC 

 

 

Tables

Table 1: Contact Information of Key Personnel

Table 2: Contact Information of ET 

Table 3: Contact Information of IEC 

 

 

 


1        Introduction

The Environmental Impact Assessment (EIA) Report (Register No.: AEIAR-185/2014) prepared for the “Expansion of Hong Kong International Airport into a Three-Runway System” (the Project) has been approved by the Director of Environmental Protection, and an Environmental Permit (EP) (Permit No.: EP-489/2014) has been issued for the project under the Environmental Impact Assessment Ordinance.

The purpose of this updated Management Organizations is to provide the latest information based on the recent contracts awarded under this project. This updated Management Organizations includes the following information:

a)    the management organization of the main construction companies and/or any form of joint ventures associated with the construction of the Project (in Section 2);

b)    the management organization of the Environmental Team (ET) (in Section 3);

c)     the management organization of the Independent Environmental Checker (IEC) and his team (in Section 4); and

d)    organization charts, names of responsible persons and their contact details.

 

 

2        Management Organization of the Main Construction Companies

2.1        Advanced Works Contract

Langfang Huayuan Mechanical and Electrical Engineering Co., Ltd. (Contract P560(R)) is the contractor appointed to undertake the diversion of the existing submarine aviation fuel pipelines. Construction works of Contract P560(R) have been completed.

2.2        Deep Cement Mixing (DCM) Works Contracts

Penta-Ocean-China State-Dong-Ah Joint Venture (Contract 3201), Samsung-Build King Joint Venture (Contract 3202), Sambo E&C Co., Ltd. (Contract 3203), China Road and Bridge-Sambo Joint Venture (Contract 3204) and Bachy Soletanche-Sambo Joint Venture (Contract 3205) are the contractors appointed to undertake the DCM ground improvement works. Construction works of Contracts 3201, 3202, 3203 and 3204 have been completed.

Names of the responsible persons and contact details of Contract 3205 are set out in Table 1 below.

2.3        Main Reclamation Works Contract

Zhen Hua Engineering Company Ltd.-China Communications Construction Company Ltd.-CCCC Dredging (Group) Company Ltd. (ZHEC-CCCC-CDC) Joint Venture (Contract 3206) is the contractor appointed to undertake the main reclamation works.

Names of the responsible persons and their contact details are set out in Table 1 below.

2.4        Airfield Works Contracts

Fujita Corporation-China Harbour Engineering Company Ltd.-Zhen Hua Engineering Company Ltd. (FJT-CHEC-ZHEC) Joint Venture (Contract 3301) is the contractor appointed to undertake the construction works for the north runway crossover taxiway.

China Road and Bridge Corporation (Contract 3302) is the contractor appointed to undertake advance works for the eastern vehicular tunnel.

Sinohydro Corporation Limited, Powerchina Airport Construction Company Limited, Paul Y. Construction Company Limited, and Rock-One Engineering Company Limited (SAPR) Joint Venture (Contract 3303) is the contractor appointed to undertake the construction works for the new runway, taxiways, and associated works.

Paul Y. Construction Company Limited (Contract 3307) is the contractor appointed to undertake the construction works for the fire training facility on the new reclamation area.

Names of the responsible persons and their contact details are set out in Table 1 below.

2.5        Third Runway Concourse and Integrated Airport Centres Works Contract

Wing Hing Construction Co., Ltd. (Contract 3402) is the contractor appointed to undertake enabling works for the new Integrated Airport Centres.

Sun Fook Kong Construction Limited (Contract 3403) is the contractor appointed to undertake building and civil works for the new Integrated Airport Centres.

China Road and Bridge Corporation – Bachy Soletanche Group Limited – LT Sambo Co., Ltd Joint Venture (Contract 3405) is the contractor appointed to undertake foundation and substructure works for the Third Runway Concourse.

Names of the responsible persons and their contact details are set out in Table 1 below.

2.6        Terminal 2 Expansion Works Contracts

Build King Construction Ltd. (Contract 3501) is the contractor appointed to undertake the construction works for antenna farm and sewage pumping station. Construction works of Contract 3501 have been completed.

Build King Construction Ltd. (Contract 3502) is the contractor appointed to undertake Terminal 2 (T2) automated people mover (APM) depot modification works. Construction works of Contract 3502 have been completed.

Leighton–Chun Wo Joint Venture (Contract 3503) is the contractor appointed to undertake T2 foundation and substructure works.

Gammon Engineering & Construction Company Limited (Contract 3508) is the contractor appointed to undertake T2 expansion works.

Names of the responsible persons and their contact details of Contracts 3503 and 3508 are set out in Table 1 below.

2.7        Automated People Mover Works Contracts

CRRC Puzhen Bombardier Transportation Systems Ltd. and CRRC Nanjing Puzhen Co., Ltd. (PBTS – CRRC PZ) consortium (Contract 3601) is the contractor appointed to undertake works for the new Automated People Mover (APM) system (TRC Line).

Niigata Transys Company Ltd. (Contract 3602) is the contractor appointed to undertake the existing APM system modification works.

Names of the responsible persons and their contact details are set out in Table 1 below.

2.8        Baggage Handling System Works Contract

Vanderlande Industries Hong Kong Limited and Shun Hing Systems Integration Company Limited (Contract 3603) is the contractor appointed to undertake the construction works of baggage handling system (BHS).

Names of the responsible persons and their contact details are set out in Table 1 below.

2.9        Construction Support (Facilities)

China State Construction Engineering (Hong Kong) Ltd. (Contract 3721) is the contractor appointed to undertake the construction of the infrastructure works and building facilities on the new reclamation area.

Tapbo Construction Company Limited and Konwo Modular House Limited Joint Venture (Contract 3722) is the contractor appointed to undertake the design and construction of support facilities in western support area.

Names of the responsible persons and their contact details are set out in Table 1 below.

2.10     Airport Support Infrastructure

China State Construction Engineering (Hong Kong) Ltd. (Contract 3801) is the contractor appointed to undertake the construction works of APM and BHS tunnels on existing airport island.

Gammon Engineering & Construction Company Limited (Contract 3802) is the contractor appointed to undertake the construction works of APM and BHS tunnels and related works mainly on reclaimed land area.

Names of the responsible persons and their contact details are set out in Table 1 below.

2.11     Construction Support (Services/ Licenses)

K. Wah Concrete Company Limited (Contract 3901A) and Gammon Construction Limited (Contract 3901B) are the licensees appointed to establish, operate, and maintain concrete batching facilities at the Project site.

Names of the responsible persons and their contact details are set out in Table 1 below.

Table 1: Contact Information of Key Personnel

Party

Position

Name

Telephone

Email

Contract 3205

DCM (Package 5)

(Bachy Soletanche- Sambo Joint Venture)

Deputy Project Director

Min Park

9683 0765

mpark@bsglsambo.com

Environmental Officer

Steven Chan

6288 0189

th.chan@bsglsambo.com

Contractor 3206

Main Reclamation Works

(ZHEC-CCCC-CDC Joint Venture)

Project Manager

Alan Mong

3763 1352

alan.mong@3206.zccjv3rs.com

Environmental Officer

Kwai Fung Wong

3763 1452

kf.wong@3206.zccjv3rs.com

Contract 3301

North Runway Crossover Taxiway

(FJT-CHEC-ZHEC Joint Venture)

Deputy Project Director

Kin Hang Chung

9800 0048

samuel.chung@chechk.com

Environmental Officer

Joe Wong

6182 0351

joewong@fujitaco.com.hk

Contract 3302

Eastern Vehicular Tunnel Advance Works

(China Road and Bridge Corporation)

Project Manager

Dickey Yau

5699 4503

dickey.yau@crbc.com.hk

Environmental Officer

Dennis Ho

5645 0563

dennis.ho@crbc.com.hk

Contract 3303

Third Runway and Associated Works

(SAPR Joint Venture)

Project Manager

Andrew Keung

6277 6628

andrewkeung@saprjv.com

Environmental Officer

Max Chin

6447 5707

maxchin@saprjv.com

Contract 3307

Fire Training Facility

(Paul Y. Construction Company Limited)

Project Manager

Steven Meredith

6109 1813

stevenmeredith@pyengineering.com

Environmental Officer

Albert Chan

9700 1083

albertchan@pyengineering.com

Contract 3402

New Integrated Airport Centres Enabling Works

(Wing Hing Construction Co., Ltd.)

Contract Manager

Michael Kan

9206 0550

michaelkan@whconst.com.hk

Environmental Officer

Lisa He

5374 3418

lisahe@whconst.com.hk

Contract 3403

New Integrated Airport Centres Building and Civil Works

(Sun Fook Kong Construction Ltd.)

Project Manager

Alice Leung

9220 3162

aliceleung@sfk.com.hk

Environmental Officer

Alpha Chia

9626 1114

alphachia@sfk.com.hk

Contract 3405

Third Runway Concourse Foundation and Substructure Works

(China Road and Bridge Corporation – Bachy Soletanche Group Limited – LT Sambo Co., Ltd. Joint Venture.)

Project Manager

Francis Choi

9423 3469

francis.choi@crbc.com.hk

Environmental Officer

Jacky Lai

9028 8975

jacky.lai@crbc.com.hk

 

Contract 3503

T2 Foundation and Substructure Works

(Leighton–Chun Wo Joint Venture)

Project Manager

Eric Wu

3973 1718

eric.wu@lcwjv.com

Environmental Officer

Malcolm Leung

3973 0850

Malcolm.Leung@lcwjv.com

Contract 3508

Terminal 2 Expansion Works

(Gammon Engineering & Construction Company Limited)

Project Director

Richard Ellis

6201 5637

Richard.Ellis@gammonconstruction.com

Environmental Officer

Gena Tsang

9511 2283

Gena.Tsang@gammonconstruction.com>

Contract 3601

New APM System (TRC Line)

(CRRC Puzhen Bombardier Transportation Systems Limited and CRRC Nanjing Puzhen Co., Ltd. Joint Venture)

Project Manager

Hongdan Wei

158 6180 9450

wei.hongdan@pbts-crrc.com

Environmental Officer

K F Li

9086 1793

kfli@creceeb.com

Contract 3602

Existing APM System Modification Works

(Niigata Transys Co., Ltd.)

Project Manager

Kunihiro Tatecho

9755 0351

kunihiro_tatecho@niigata-transys.com

Environmental Officer

Yolanda Gao

5399 3509

yolandagao@ihi.com.hk

Contract 3603

Baggage Handling System

(Vanderlande Industries Hong Kong Ltd. and Shun Hing Systems Integration Co., Ltd.)

Project Manager

K C Ho

9272 9626

ho.kee.cheung@shunhinggroup.com

Environmental Officer

Eric Ha

9215 3432

eric.ha@shunhinggroup.com

Contract 3721

Construction Support Infrastructure Works

(China State Construction Engineering (Hong Kong) Ltd.)

Site Agent

Thomas Lui

9011 5340

thomas_lui@cohl.com

Environmental Officer

Xavier Lam

9493 2944

xavier_lam@cohl.com

Contract 3722

Western Support Area – Construction Support Facilities

(Tapbo Construction Company Limited and Konwo Modular House Ltd. Joint Venture.)

Deputy Project Director

Philip Kong

9049 3161

philipkong@konwo.com.hk

Environmental Officer

Sampson Lo

9752 9118

sampsonlo@konwo.com.hk

Contract 3801

APM and BHS Tunnels on Existing Airport Island

(China State Construction Engineering (Hong Kong) Ltd.)

Project Manager

Tony Wong

9642 8672

tony_wong@cohl.com

Environmental Officer

Federick Wong

9842 2703

cheukwai_wong@cohl.com

Contract 3802

APM and BHS Tunnels and Related Works

(Gammon Engineering & Construction Company Limited)

Project Director

John Adams

6111 6989

john.adams@gammonconstruction.com

Environmental Officer

Andy Leung

9489 0035

andy.leung@gammonconstruction.com

Contract 3901A Concrete Batching Facility

(K. Wah Concrete Company Limited)

Project Manager

Benedict Wong

9553 2806

benedictwong@kwcml.com

Environmental Officer

C P Fung

9874 2872

cpfung@kwcml.com

Contract 3901B

Concrete Batching Facility

(Gammon Construction Ltd.)

Senior Project Manager

Gabriel Chan

2435 3260

Gabriel.Chan@gammonconstruction.com

Environmental Officer

Rex Wong

2695 6319

Rex.Wong@gammonconstruction.com

 

 

Attachment A presents the organization charts of all the above-mentioned contractors required under EP Condition 2.4.

 

 

3        Management Organization of the Environmental Team

The management organization of the Environmental Team (ET), including names of the ET Leader and Deputy ET Leaders and their contact details are set out in Table 2 below:

Table 2: Contact Information of ET

Name

Position

Telephone

Email

Terence Kong

ET Leader

2828 5919

Terence.Kong@mottmac.com

Heidi Yu

Deputy ET Leader

2828 5704

Heidi.Yu@mottmac.com

Daniel Sum

Deputy ET Leader

2585 8495

Daniel.Sum@mottmac.com

 

Attachment B presents an organization chart of the ET (together with that for the IEC, as described in Section 4 below) required under EP Condition 2.4.

 

 

4        Management Organization of the Independent Environmental Checker and His Team

The management organization of the Independent Environmental Checker (IEC), including names of the IEC and Deputy IEC are set out in Table 3 below:

Table 3: Contact Information of IEC

Name

Position

Telephone

Email

Jackel Law

IEC

3922 9376

jackel.law@aecom.com

Roy Man

Deputy IEC

3922 9141

roy.man@aecom.com

 

Attachment B presents an organization chart of the IEC required under EP Condition 2.4.